High-pressure gas pipeline in Emsdetten

DMT Engineering Surveying was commissioned to provide comprehensive engineering services for the new construction of a high-pressure gas pipeline (DN200, DP16) with a length of approx. 3.5 km. This included involvement in the approval planning process, the drafting of tender documents and participation in the awarding of contracts, general and technical design and planning, construction supervision and surveying as well as the as-built documentation of the entire new construction.

Thyssengas GmbH is an independent German gas network company that transports up to 10 billion cubic metres of gas annually via a 4,200 km long underground transport network.

Facts, figures and data

  • Client: Thyssengas GmbH
  • New construction of a high-pressure gas pipeline (DN200, DP16)
  • approx. 3.5km length